Import issues

Import issues

Zoho Projects allows you to import issues from other issue trackers into Zoho Projects. But, before importing into Zoho Projects, you must first export the data from the other issue tracking system is in the desired file format and then import the file into Zoho Projects. The supported import file formats are CSV, XLS, and XLSX.

Feature Availability: All plans.
  1. Click  and select Import Issues.
  2. Click Choose File and select the required file extension to import and then click Continue. You can import CSV, XLS, and XLSX files.
  3. Map List of fields in Issue tracker and Columns in import file.
    • A warning message is prompted if you select the same column value for more than one field.

  1. Select the desired date format.
  2. Click Continue to confirm the file import.
  3. Click Import to import the file.
  1. Issues are displayed in the List view. A notification about the import is also mailed to your inbox.
  2. You can import files only in CSV, XLS, and XLSX format.


    • Related Articles

    • Is it possible to import the custom fields for issues within a project?

      Yes. we do have a option to import the issues along with custom fields. The supported file formats are XLS, XLSX and CSV file.
    • Export issues

      Export issues to an xls or csv file. Navigate to a project and click Issues from the left navigation panel. Click  and choose the Export Issues option. The issues are exported in xls or csv format. You can also choose to export issues ...
    • Delete issues

      Delete an issue In the Kanban or List view, click on an issue and then click  in the upper-right corner to delete it. Issues with invoiced time logs cannot be deleted. Delete issues in bulk Issues can be deleted in bulk. Select multiple issues from ...
    • Link issues

      Link issues and create dependencies to track and close them. You can associate issues based on a criterion, restrict issue closure, set dependencies, duplicate and clone issues. And you can link issues using the default link types such as Blocks, ...
    • Update issues

      You can update issue details such as Assignee, Due Date, Status, and others for multiple issues with one click.  Select the check box next to any issue to enable the Update option. Select the Update check box to update all the issues. You can also ...